Basic Settings โฒ
10 process stages
Recommended: 3 | Max: 5
tanks
Total line: 10.8 m
Lift time: 6.0s per move
m/min
15.0 m/min ยท 49.2 ft/min
m/min
30.0 m/min ยท 98.4 ft/min
Degrees:
Carrier tilts at this angle during drip phase
Motion Settings โผ
Vertical Motion (multi-phase) โผ
Timing โผ
Production Requirements โผ
Stage Configuration โฒ
| # | Name | ProciProcess Time (Nominal) Target time the carrier remains in this tank. The hoist will not remove the carrier before the minimum process time (nominal ร 0.9 by default). |
DripiDrip Time Time the carrier is held above the tank after lifting, allowing liquid to drain back. Carrier is tilted during this phase. |
Type | Pitch |
|---|
Save / Load โผ